2020 Projects
List of Services
-
Capitol House, Green Lanes
29 one bedroom, 37 two bedroom and 18 three bedroom flats with associated access, landscaping and parking following the demolition of the existing building.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets
-
Cranfield University, Bedford
Five 5 storey buildings to create 613 bed student accommodation with associated car parking, cycle parking and landscaping.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets
-
Kidbrooke, Blackheath
Kidbrooke Village Centre phase 3 comprising 753 apartments over 4 blocks ranging from one to four bedrooms along with 2,499sqm retail space, 525sqm creche, 331sqm restaurant, 2,207sqm community centre, 1,306sqm leisure centre and 1,265sqm health centre. Works will include associated access, parking and landscaping.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets, Floating Shelf Units, Vanity Tops and Bath Panels
-
Ancoats Gardens, Manchester
44 one bedroom, 105 two bedroom and 6 three bedroom flats with retail units, restaurants, gym, amenity space and offices with parking, access and landscaping
Plantavi was appointed to Design, Manufacture and Supply Vanity Units
-
Egham Gateway West, Surrey
New buildings providing 100 apartments, 101 bed student accommodation with common room, welfare facilities, laundry and storage, cinema (1,247sqm), retail units (1,311sqm) and office with car parking, access and landscaping, following demolition works.
-
Courtyard by Marriott - Sandy Park, Exeter
New hotel with 250 bedroom with associated access, parking and landscaping.
Plantavi was appointed to Design, Manufacture and Supply Vanity Units
-
Royal Arsenal Riverside, Building 10
Royal Arsenal Riverside is a collection of one, two and three-bedroom apartments and luxury suites and penthouses. The development is in prime location along the River Thames.
Plantavi was appointed to Design, Manufacture and Supply Mirror Framed Units, Vanity Units and Bath Panels
-
Hampton By Hilton, High Wycombe
New 150 bedroom six storey hotel with associated access, parking and landscaping.
Plantavi was appointed to Design, Manufacture and Supply LED Floating Shelves
-
The Vantage, Nottingham
Demolition of existing buildings and erection of a part 5, part 6, part 10 and part 12 storey building comprising 485 student apartments.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets
-
Walnut Tree Close, Guildford
361 bed student accommodation with access, parking and landscaping.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets and Vanity Units
-
Hampton By Hilton York
155 bedroom hotel with gym, associated access and parking, office, meeting room, kitchens and landscaping and 8 two bedroom flats following demolition of existing building.
Plantavi was appointed to Design, Manufacture and Supply LED Floating Shelves
-
Wellington Road, Leeds
The development on Wellington Street will include one and two-bedroom apartments over 18 storeys with views across the River Aire.
Plantavi was appointed to Design, Manufacture and Supply Bath Panels
-
Stay City Commercial Road, London
A 14-storey building comprising a 156-bedroom hotel at 73-77 Commercial Road in Whitechapel, E1.
Plantavi was appointed to Design, Manufacture and Supply Vanity Units
-
Dundee Street, Edinburgh
Student accommodation with office, reception and retail to the ground floor with associated landscaping and car parking.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets and Vanity Units
-
Botanic Link, Belfast
Student accommodation with office, reception and retail to the ground floor with associated landscaping and car parking.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets and Vanity Units
-
Cathedral Street, Glasgow
370 bed student residence, ground floor retail unit and ancillary works.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets and Vanity Units
-
Future Generations, Guilden ParkList Item 3
Student Accommodation to provide 533 bed spaces with en suites, included with a gym, student amenity space and associated works following demolition.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets
-
Luxurio, LoughboroughList Item 4
Student accommodation comprising 440 beds, offices, retail space, toilets, community space with kitchen, plant room, roof top football pitch, landscaping, parking and access following demolition of existing buildings.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets
-
Bath Lane, Leicester
464 student bedrooms, 184 residential flats with retail units, landscaping and parking.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets
-
Dart Square, Sheffield
Construction of a 16 storey building to comprise of 38 cluster flats and 29 studio apartments to provide student accommodation for up to 250 students together with car and cycle parking, landscaping and access improvements. The new facility will also include amenity space including games area, gymnasium, cinema, library and common room and lounge areas.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets and Vanity Units
-
Kelaty House, First Way Wembley
Construction of 599 bedroom student accommodation, hotel and retail units with associated access, parking and landscaping.
Plantavi was appointed to Design, Manufacture and Supply Vanity Units and Floating Shelves
-
Marshgate, Stratford
Construction of a 12 storey building to provide 261 flats, business units and seven townhouses. Works will include car parking, access, open space and landscaping.
Plantavi was appointed to Design, Manufacture and Supply Mirror Cabinets